1) Invert the tank, push down the base hardware and unscrew to

disengage it;

2)Push and unscrew to remove the used coil and also push and

screw to install a new one;

3) Push down and screw in to relocate the base hardware.

Note: The pressing and twisting operations in each step are performed simultaneously.